Water Management and Early Flood Warning for Songkhla Lake Basin (SLB) Royal Irrigation Department (RID)

Solution:

  • 79 Telemetering Stations
  • 8 water quality stations i.e. Dissolved Oxygen, pH, Electro-connectivity and Salinity
  • 78 water level stations
  • 79 rain-guage stations
  • Hydrology Model: MIKE 11 flood forecasting including water quality forecasting for Songkhla Lake
  • Real time monitoring data
  • Online CCTV for the water level monitoring

Project Size: 3.2 Million USD

Posted in Success Stories and tagged , .