EGAT and Metlink Signed CA to Study Cryogenic Carbon Capture technology

EGAT and Metlink joined hands to sign a CA on Information Exchange on Cryogenic Carbon Capture Technology, aiming at applying it with EGAT power plants and mitigating Global Warming.

On March 20, 2024, Mr. Thidade Eiamsai, Deputy Governor – Power Plant Development and Renewable Energy of Electricity Generating Authority of Thailand (EGAT), and Mr. Prapan Asvaplungprohm, Director and Chief Executive Officer of Metlink Info Co., Ltd. (Metlink), entered into the Confidentiality Agreement (CA) on Information Exchange on Cryogenic Carbon Capture (CCC) Technology. On this occasion, Mr. Chatchai Mawong, EGAT Assistant Governor – Power Plant Engineering and Construction, and Mr. Nipon Limboonsuebsai, Metlink General Manager, were the witnesses in the signing ceremony, held at EGAT 50th Anniversary Building, EGAT Headquarters, Nonthaburi Province.

Mr. Thidade Eiamsai, EGAT Deputy Governor – Power Plant Development and Renewable Energy, said that this collaboration marks a vital step to broaden the knowledge on carbon emissions reduction with the CCC, an interesting technology, to be applied with EGAT power plants in the future. This initiative plays a part of the implementations under EGAT Triple S Strategy – S Sink by means of “Carbon Capture, Utilization, and Storage (CCUS),” to achieve EGAT Carbon Neutrality within 2050.

Mr. Prapan Asvaplungprohm, Metlink Director and Chief Executive Officer, revealed that this collaboration will contribute to the achievement of CCUS with the low-cost initiative by applying the alternative CCC technology, which is now being developed for using in the power plants. The technology ensures cost competitiveness and provides nearly 100% pure carbon dioxide captured that has the potential to be utilized in other industries such as food and beverage and medical applications. 

DEPA Smart School Bus Innovative and Intelligent Platform

Solution:

  • Provide digital innovation and technology in promote safety for elementary to secondary school students traveling by school busses within smart cities.
  • Provide Smart School Bus management platform suits for schools, parents and safety in the smart cities.
  • Covered 350 primary and secondary schools installing the Smart School bus platform that is beneficial to more than 30,000 students.
  • Develop integrated data connecting system for student’s transportation in main provinces by promoting the Smart School Bus Big Data Platform and Smart School Bus Intelligent Operation Center in each province.
  • Develop application for data management for Smart School Bus Intelligent Operation Center management system supported in both iOS, Android and Web Browser for users to track real-time location for student’s safety monitoring.

Project Size: 2.5 Million USD

Smart Education for Schools of CHaiyaphum Provincial Administration Organization (CHPAO)

Solution:

  • Smart application designed and developed to function approaching through Student-Centered Learning (SCL) concept i.e. student affairs, face scan, monitoring, classes attendance checking, curriculum & time table online records, student’s behavior scoring, student admission system, teachers/students registration, Strengths & Difficulties Questionnaire (SDQ), homework assignments and examination archives, Educational Quality Assurance and etc.
  • Educational Media Production Studio and Equipment.
  • Electric Vehicle (EV) School Buses and Charging Stations.
  • IoT and Digital platform for agriculture and water quality assessment, Electric Vehicle (EV) school bus GPS and Wristband tracking.
  • Dell Hyper-converged infrastructure (HCI)

Project Size: 5.4 Million USD

SCADA/EMS/DMS for Metropolitan Electricity Authority

Solution:

  • Feature-rich and flexibility platform providing real-time monitoring and control application with advanced situational awareness.
  • Transformative solution suited to balance the transport of power on the transmission grid through reliable real-time operations while enabling renewable integration.
  • Integrated solution suite for active management of distribution grids including advanced applications and distributed energy resource management.
  • Enable hands-on experience with events and scenarios ranging from switching, system faults, overloads, storm operation and more.
  • 200+ Substation RTUs
  • 10,000+ Feeder RTUs
  • Seamless integration with GIS
  • Dell – Linux Enterprise

Project Size: 16 Million USD

Motor Operated for Feeder Circuit Breaker of Low Voltage Electrical System at Suvarnabhumi International Airport

Solution:

  • Total service provider of power engineering to improve and enhance Motor Operated for Feeder Circuit Breakers all at the Passenger Terminals of BKK-Suvarnabhumi International Airport
  • The world-class products of Motor Operated 220-240 VAC and Auxiliary Contact (On/Off/Trip) of Molded Case Circuit Breakers (MCCB) are set up and configured to interoperate with SCADA.
    • ABB Model: SACE Isomax Family
    • Siemens Models: LMD, HJD, HFD, HHF, HED

Project Size: 2 Million USD

Water Management and Early Flood Warning for Songkhla Lake Basin (SLB) Royal Irrigation Department (RID)

Solution:

  • 79 Telemetering Stations
  • 8 water quality stations i.e. Dissolved Oxygen, pH, Electro-connectivity and Salinity
  • 78 water level stations
  • 79 rain-guage stations
  • Hydrology Model: MIKE 11 flood forecasting including water quality forecasting for Songkhla Lake
  • Real time monitoring data
  • Online CCTV for the water level monitoring

Project Size: 3.2 Million USD

Data Analytics of Filing Cases for Court of Justice Phase 1

Solution:

  • Informative integration & centralization architecture
  • Structured database design on analytical fact/dimension schemas
  • Court intelligence agent by Rapid Application Development (RAD) Tool & Technique
    • Relational Database Management System (RDBMS)
    • ETL (Extract-Transform-Load) tool
    • Federation search technique
    • SAP Crystal Reports
  • IBM Power & SAN systems

Project Size: 1.9 Million USD